Directional boring
We drill under roads, driveways, and creeks without cutting them open. The surface stays the way we found it.
Every bore starts with a locate ticket and a walked path. We steer with a walkover locator and log pitch and depth as the head moves, so the bore stays clear of what is already down there and holds the cover the road authority requires. Entry and exit pits are kept small, spoils are contained, and the ground gets compacted and restored before we leave.